UCC Entrance Bridge
May 22, 2020 1:41 pm Leave your thoughtsStrengthening and repair works were to be conducted for the entrance bridge at the gates of UCC. A significant structure within the college grounds it was essential that a professional team were employed to carry out the works. AB Access Scaffolding provided a suitable access and working platform arrangement which gave the scaffold sufficient stability should flooding occur but while also maintaining an exclusion depth to general river levels. This meant that disruption to the general water course was minimised throughout.
Categorised in: Commercial, Projects
This post was written by abaccess