26 – 27 South Mall

May 21, 2020 11:52 am Published by Leave your thoughts

The 3 Store at Daunt Square required façade repair works to be completed by RBR. Our scope of works was to provide full access to all areas of the façade on both Daunt Square and returning down Grand Parade towards Paul Street. A protective fan was included in the works along with Debris Netting to the scaffold to both contain dust and materials along with providing additional safety to the public below.

Full access routes were maintained at the base of the scaffold to allow all businesses operate as normal. The scaffold was also erected to facilitate the business hours of premises along with the safety of the public duration the erection process with barriers and a safe cordoned zone being put in place.

Categorised in: ,

This post was written by abaccess

Leave a Reply

Your email address will not be published.